EXAMPLE

1 minute of downtime
costs you $10

12 hours of production a day 
x $10/minute = $7200 per day in production loss

24 hours of production a day
x $10/minute = $14,400  production loss

*In two months, losing 12 hours of production a day can cost you upwards of half a million dollars.

Other important notes:
The PLC5 has been discontinued and is no longer supported by Rockwell.

Upgrade all at once or in phases. A variety of solutions to choose from. A Multi-diverse one-stop-shop. After support available from experienced engineers. A walk through of your plant and/or assessment of existing equipment

 

Benefits of upgrading:
• Greater equipment utilization
• More production flexibility and scalability
• Higher performance and efficiency
• Access to plant-wide information
• Increased integration for plant-wide control
• Increased ability to meet global standards
• Increased competitive advantage
• INCREASED PRODUCTION

Reductions seen when upgrading:
• Reduced maintenance and energy costs
• Reduced operations costs
• Reduced risk
• Reduced spares for obsolete equipment
• REDUCED WASTED TIME

UPGRADE TODAY